Thursday, 1 March 2012

Purchases and another roof


The view from the front door has now changed as the structure for the roof above the water tank/veranda is in place.

After months of trying to get hold of a dry toilet, we managed to buy one. Just waiting for the bath and the eco-urinals now!

Some of the sockets are in place, (there is a reason for the otherwise-boring photo...)



The Garden in Spring





The end of February brought us some very welcome warm sunshine, and the plants thought so too. The compost bin has been in full-swing; the mandarin trees are covered in buds, and everything is growing quickly.

Tuesday, 7 February 2012

In the details
















January seems to have been a slow month, but there has been a lot of progress when you step back and look at it.

With the exception of the porch, all of the roofing has been done and the drainpipes are in place. Time for the house to dry our properly now.

I spent a day painting the study recently, and now all that is left to do in there is to put down the floor... and as our road is now open, we splashed out last week on a load of fired terracotta floor tiles which will be used throughout most of the house.

Celso and Rosalino have been busy fitting the windows in the main bedroom, and the clear roof over the living room is finished.

And most excitingly... we have a (yet to be painted) front door!




A new road



After many, many months of waiting the new road has finally been finished and is now open to (both canine and vehicular) traffic.

December






What with moving house and having visitors, we didn't get a chance to upload these photos from December.

Here you can see the biiiiiiig window in the living/dining room. It lets in an amazing amount of light.

The arch leads from said living/dining room to the downstairs bathroom, bedroom and stairs.

And lastly, guest starring Mum & Dad, a photo from the street, showing Don Fernando's house in front of ours.

Friday, 2 December 2011

Light = Luz



The electrician has got a few cable guides in position in the wall, so the top of the stairwell is almost finished as you can see here. Even though it's been really cold recently, the sun coming in through the roof helps cheer things up and stop the house from being too cold too!

Work has started on the small roof above the balcony in the main bedroom. It'll be nice to see that finished, as at the moment every time it rains, the bedroom gets flooded!

We quite enjoyed noticing a couple of details that happen to have appeared in the photos - such as the smoke from the builders' cooking and the wads of money on the floor as it was Friday (i.e. pay-day!)

Saturday, 19 November 2011

Far too civilised (almost)...


Road works are now progressing faster than we expected... it looks like we might actually have fully-functioning road and pavement access to the house by Christmas. We still had to treck through a quagmire of mud in yesterday's rain, though...

On another note, our peach tree seems to have been confused by the sunny weather we've had recently. Beautiful as it is, I can't help but think it really shouldn't be blossoming in November!

Colour!







After having spent so long with the house being that delightful colour called "cement", it seems to be springing to life now that the paint is starting to go on.

We're also loving the amount of daylight upstairs, something that we notice even more now that the walls have got their first coat of white paint.

Hector and Rosalino are now dedicating themselves to the 'tapanco' (the wooden mezzanine above the living room), and with the beams in place you can now get a better picture of what it'll be like.

Monday, 7 November 2011

Los lavabos

Other people in Xalapa go shopping at "Liverpool" but we decided to do our bit of impulse-buying when we saw a massive collection of ceramic washbasins for sale. These are the two we chose. Pretty chuffed with them, particularly for 450 pesos each!

We're now planning colour schemes for the bathrooms. There are even tiles matching the design on the left.

Saturday, 29 October 2011

Windows







With (most) of a roof now over our heads, the next step is putting in the windows. At the moment they're just frames, but even so, seeing them in their places makes the house look a lot more housey.

We spent a couple of hours this afternoon painting the drainpipes brick red, which will not only keep the rust off, but should also look rather jolly against the yellow we plan to paint the house.

Monday's task: meet with the plumber/electrician. Getting there now!

Tuesday, 18 October 2011

Milky Way






The policarbonate transparent sheets are now in place over the stairwell; (in progress in the shot here).

A bit of the "Onduline" roof has gone in over the upper balcony, too.

The weather has been fairly dry for a few days which is lucky as they've been stapling the milk cartons into place! All these months washing and collecting are finally paying off!

A couple of window frames have arrived, so it's all go!

Monday, 10 October 2011

A roof over our heads






It's all quite exciting at the moment: we're starting to see the results of there being five builders on the job. The wooden bases of the roofs are now in place (90% done in the photos), and we've now bought some of the policarbonate and a few sheets of Onduline, ready for when Horacio gives the maestros the thumbs up.

Saúl has been working on the north-facing balcony at the top of the house, which gets some lovely afternoon sunshine.

October brought with it a bunch of workers and some diggers. We hadn't realised how wide the track (road-to-be) is. Hopefully it won't look like a motorway anytime soon!

A belated late-September post






Plenty going on at the moment - the beans and peas seem very happy, Daisy has sorted out some plants to edge part of the path at the back, all the roof beams are in place and we've started planning bottle arrangements for some of the walls.

The upstairs back bedroom is going to end up having a rather nice high ceiling. Steve was particularly happy with the photo of Leborio's foot.

Saturday, 17 September 2011

The Pre-Columnas Age





We've planted eight trees so far, four of which are on our land - the others are on the land next door.

We managed to get my granddad up to the garage, but he wasn't too up for walking up to the house and from what he saw he wasn't too impressed anyway!

Celso is the new member of the team and has been working on preparing the columns on the water tank/veranda. They've been working seven days a week recently and tomorrow are planning on filling the cardboard pillars with cement.

The others are still working on the roof, which is going fine. Daisy and I measured up our milk carton sheets today, as we were told that we'll need a total of 43 square metres or so. Only fifteen to go...